Martog Global Services is Nigeria's premier indigenous EPCIC contractor — live-line intervention, flowline construction and marine operations across the Niger Delta's toughest land, swamp and creek terrain.
Incorporated in 2018 and headquartered in Port Harcourt, Martog executes complex engineering, procurement, construction, installation and commissioning for the most demanding operators in Nigerian oil and gas — with every project closed out on formal COR documentation.
From a two-day clamp installation to a multi-month flowline campaign, every scope moves through the same seven-stage gate process — mobilize, survey, engineer, execute, test, reinstate, close out.
Full and sectional replacement of well flowlines and trunk lines — ROW preparation, stringing, welding to ISO 13847, coating, tie-in, hydrotest and reinstatement. Land, swamp and creek.
Hot taps, full-encirclement sleeves, EGBA→Plidco clamp changeouts, split-tee in-service welding, golden-weld sectional replacements and positive isolation on operating hydrocarbon systems.
Cofferdam construction in open swamp, marine riser repair, dredging works, and full creek logistics — swamp buggies, tugboats, ramp barges, houseboat spreads.
CP installation and monitoring, ultrasonic inspection, and coating systems — Stopaq, polykene, diamond wrap and concrete — protecting asset life in the Delta's harshest terrain.
Manifold rehabilitation and upgrades, chemical-injection skid installation, barrel doors, pig traps and anti-tamper systems for flowstation infrastructure.
Line pipe, valves, fittings, flanges and sheet piles — sourced, expedited and fabricated on-site by certified welders under full QA/QC documentation.
Delivered across Rivers, Bayelsa and Imo States on Shell SPDC and Renaissance Africa Energy (RAEC) pipeline networks — directly and through main-contractor partnerships, all with full COR traceability.
11.6 metres of 4" Sch 80 API 5L X52 PE-coated flowline replaced in creek terrain for Western Development Company Ltd — job owner Renaissance Africa Energy (OABP). Marine spread: swamp buggy, tugboat, ramp barge.
| NO | PROJECT | SCOPE | LOCATION | CLIENT | COMPLETED |
|---|---|---|---|---|---|
| 01 | Repair by Clamping on 24" TNP @ Nonwa | Pipeline Clamping | Nonwa, Rivers | RAEC | Oct 2022 |
| 02 | EGBA Clamp Installation, 28" Nkpoku–Ebubu TNP @ Bodo | EGBA Clamp | Bodo, Rivers | RAEC | Aug 2025 |
| 03 | Cofferdam Leak Repair by Clamping @ Orukiri | Cofferdam Repair | Belema, Rivers (Swamp) | RAEC | Jul 2025 |
| 04 | CI Skid Upgrade & Installation @ Nkpoku Manifold | CI Skid | Rukpokwu, Rivers | RAEC | Jul 2025 |
| 05 | Split Tee In-Service Welding @ Eneka | In-Service Welding | Eneka, Rivers | RAEC | Jun 2025 |
| 06 | IC Leak Repair by Clamping, 18" Assa TL @ Ochia | Pipeline Clamping | Ochia, Imo | RAEC | May 2025 |
| 07 | Positive Isolation, 28" UPS TNP @ Ebubu Manifold | Positive Isolation | Ebubu, Rivers | RAEC | May 2025 |
| 08 | Post-IP Sectional Replacement (Golden Weld) @ Rukpokwu | Sectional Replacement | Rukpokwu, Rivers | RAEC | May 2025 |
| 09 | Post-IP Sectional Replacement ×2 @ Ikarama | Sectional Replacement | Ikarama, Rivers | SPDC | Apr 2025 |
| 10 | Oil Spill Leak Repair by Clamping, 28" TNP @ Bodo | Pipeline Clamping | Bodo, Rivers | RAEC | Mar 2025 |
| 11 | Sectional Replacement, 12" Kolocreek NAG @ Otuasega | Sectional Replacement | Otuasega, Bayelsa | SPDC | Mar 2025 |
| 12 | Split Tee In-Service Welding @ Ibaa | In-Service Welding | Ibaa, Rivers | SPDC | Feb 2025 |
| 13 | IC Repair by Clamping, 6" Line @ Okutukutu | Pipeline Clamping | Okutukutu, Bayelsa | SPDC | Jan 2025 |
| 14 | Multi-location EGBA→Plidco, 24" Ogale–Bodo TNP | EGBA Clamp | Nonwa · Kpite · Bera, Rivers | RAEC | Nov 2025 |
| 15 | Mechanical POI Investigation, 24" TNP @ Egbalor | Positive Isolation | Egbalor, Rivers | RAEC | Nov 2025 |
| 16 | EGBA Clamp Changeout, 20" Rumuekpe–Nkpoku TNP @ Ibaa | EGBA Clamp | Ibaa, Rivers | RAEC | Dec 2025 |
| 17 | Post-IP Defect Repair by Sectional Replacement @ Agbonchia | Sectional Replacement | Eleme, Rivers | RAEC | Dec 2025 |
| 18 | EGBA Clamp Replacement, 36" Rumuekpe–Nkpoku @ Rumuji | EGBA Clamp | Rumuji, Rivers | RAEC | Sep 2025 |
| 19 | Post-IP Defect Dig Verification, 28" TNP (3 locations) | Defect Verification | Bodo · Nokpor · Eteo, Rivers | RAEC | Aug 2025 |
| 20 | JIV / In-Service Welding (Split Tee), 36" Rumuekpe–Nkpoku | In-Service Welding | Ibaa, Rivers | SPDC | 2025 |
| 21 | Sectional Replacement of 4" W15T Flowline (11.6m) — Diebu Creek NEW · FLOWLINE | Flowline Replacement | Otokolomabia, Diebu Creek, Bayelsa | RAEC | Jun 2026 |
Showing 21 of 46 documented projects. The complete ISO 9001-aligned register with scope descriptions, dates and COR references is available for pre-qualification: projects@martoglobal.com
Every intervention is planned through Job Hazard Analysis, executed under permit-to-work control and supervised by competent HSE personnel. 150,000+ safe man-hours across live pipeline operations — and every single Close-Out Report incident-free.
JHA & risk assessment on every scope. Site-specific HSE plans. Emergency response mapping.
Permit-to-work discipline. Gas testing on live lines. Positive isolation verification.
Daily toolbox talks. Competency-verified welders. Trained fire watches.
Incident-free CORs. Client HSSE audits. Continuous improvement reviews.
Behind the leadership: certified argon & arc welders, pipe and mechanical fitters, civil engineers, riggers, machinists and QHSE professionals — able to execute in any Niger Delta terrain.
PhD Operations & Production Management. Geoscientist. The standard-setter.
Drives every mobilization from award to close-out report.
Marine spreads, materials and movement across three states.
Guardian of the 0.00 — permits, JHAs and the safety culture.
For Martog personnel only. Use your @martoglobal.com address and the team access code issued by Admin.
Unsafe act, unsafe condition, near-miss — report it the moment you see it. Every card is reviewed by HSSE lead.
Send report → hse@The live 46-project execution register with scopes, dates and COR references.
View register on site →Progress, manpower, equipment status and constraints — submit before 18:00 daily.
Submit report → projects@Pipe, fittings, consumables and PPE requests routed to logistics.
Raise request → finance@Company Profile 2026, HSE policy and Outlook setup guide — request current copies from Admin.
Request documents →PORTAL v1 (PILOT) · ACCESS CODE ROTATES MONTHLY · FOR UPGRADED SINGLE-SIGN-ON SECURITY, PHASE 2 DEPLOYS CLOUDFLARE ACCESS.