RC 1532483 · PORT HARCOURT · EST. 2018

We execute the pipeline work others avoid.

Martog Global Services is Nigeria's premier indigenous EPCIC contractor — live-line intervention, flowline construction and marine operations across the Niger Delta's toughest land, swamp and creek terrain.

SEE THE TRACK RECORD START A PROJECT
0PROJECTS DELIVERED 2022–2026
0.00LTI RATE — EVERY PROJECT
0SAFE MAN-HOURS
4"–36"LINE SIZE CAPABILITY
SCROLL ▾
KP 01 / THE COMPANY

Built in Nigeria. Built for the work that defines contractors.

Incorporated in 2018 and headquartered in Port Harcourt, Martog executes complex engineering, procurement, construction, installation and commissioning for the most demanding operators in Nigerian oil and gas — with every project closed out on formal COR documentation.

  • Live hydrocarbon systems. Hot taps, split tees and clamp changeouts on operating trunk lines — where precision is non-negotiable.
  • Any terrain. Land, seasonal swamp and creek — with our own marine logistics doctrine: swamp buggies, tugboats, ramp barges.
  • Audit-grade documentation. ISO 9001-aligned project register, 100% Close-Out Report traceability, NCDMB-ready reporting.
24-inch sectional replacement using cofferdam at Patrick Waterside
24" SECTIONAL REPLACEMENT · COFFERDAM · PATRICK WATERSIDE
KP 02 / CAPABILITIES

Six disciplines. One standard: delivered without excuses.

From a two-day clamp installation to a multi-month flowline campaign, every scope moves through the same seven-stage gate process — mobilize, survey, engineer, execute, test, reinstate, close out.

KP 3.1

Flowline & Pipeline Construction

Full and sectional replacement of well flowlines and trunk lines — ROW preparation, stringing, welding to ISO 13847, coating, tie-in, hydrotest and reinstatement. Land, swamp and creek.

KP 3.2

Live-Line Repair & Integrity

Hot taps, full-encirclement sleeves, EGBA→Plidco clamp changeouts, split-tee in-service welding, golden-weld sectional replacements and positive isolation on operating hydrocarbon systems.

KP 3.3

Cofferdam & Marine Operations

Cofferdam construction in open swamp, marine riser repair, dredging works, and full creek logistics — swamp buggies, tugboats, ramp barges, houseboat spreads.

KP 3.4

Corrosion Control

CP installation and monitoring, ultrasonic inspection, and coating systems — Stopaq, polykene, diamond wrap and concrete — protecting asset life in the Delta's harshest terrain.

KP 3.5

Manifolds & Facilities

Manifold rehabilitation and upgrades, chemical-injection skid installation, barrel doors, pig traps and anti-tamper systems for flowstation infrastructure.

KP 3.6

Procurement & Fabrication

Line pipe, valves, fittings, flanges and sheet piles — sourced, expedited and fabricated on-site by certified welders under full QA/QC documentation.

Cofferdam construction at 24 inch TNP Bodo West
COFFERDAM CONSTRUCTION · 24" TNP BODO WEST
Integrity check on 14 inch sleeve welding at Egbeda
14" SLEEVE WELD INTEGRITY CHECK · EGBEDA
Marine dredging works in the Niger Delta
MARINE DREDGING WORKS · NIGER DELTA
KP 03 / TRACK RECORD

46 projects. Two operator networks. Zero excuses.

Delivered across Rivers, Bayelsa and Imo States on Shell SPDC and Renaissance Africa Energy (RAEC) pipeline networks — directly and through main-contractor partnerships, all with full COR traceability.

LATEST DELIVERY · JUNE 2026 · CONTRACT CW64877

4" W15T Flowline Sectional Replacement — Otokolomabia, Diebu Creek, Bayelsa

11.6 metres of 4" Sch 80 API 5L X52 PE-coated flowline replaced in creek terrain for Western Development Company Ltd — job owner Renaissance Africa Energy (OABP). Marine spread: swamp buggy, tugboat, ramp barge.

100%RT ACCEPTANCE · ISO 13847
2 / 0JOINTS WELDED / REJECTED
1,770MAN-HOURS · ZERO LTI
14 DAYSMOBILIZE → HANDOVER
NOPROJECTSCOPELOCATIONCLIENTCOMPLETED
01Repair by Clamping on 24" TNP @ Nonwa Pipeline Clamping Nonwa, Rivers RAEC Oct 2022
02EGBA Clamp Installation, 28" Nkpoku–Ebubu TNP @ Bodo EGBA Clamp Bodo, Rivers RAEC Aug 2025
03Cofferdam Leak Repair by Clamping @ Orukiri Cofferdam Repair Belema, Rivers (Swamp) RAEC Jul 2025
04CI Skid Upgrade & Installation @ Nkpoku Manifold CI Skid Rukpokwu, Rivers RAEC Jul 2025
05Split Tee In-Service Welding @ Eneka In-Service Welding Eneka, Rivers RAEC Jun 2025
06IC Leak Repair by Clamping, 18" Assa TL @ Ochia Pipeline Clamping Ochia, Imo RAEC May 2025
07Positive Isolation, 28" UPS TNP @ Ebubu Manifold Positive Isolation Ebubu, Rivers RAEC May 2025
08Post-IP Sectional Replacement (Golden Weld) @ Rukpokwu Sectional Replacement Rukpokwu, Rivers RAEC May 2025
09Post-IP Sectional Replacement ×2 @ Ikarama Sectional Replacement Ikarama, Rivers SPDC Apr 2025
10Oil Spill Leak Repair by Clamping, 28" TNP @ Bodo Pipeline Clamping Bodo, Rivers RAEC Mar 2025
11Sectional Replacement, 12" Kolocreek NAG @ Otuasega Sectional Replacement Otuasega, Bayelsa SPDC Mar 2025
12Split Tee In-Service Welding @ Ibaa In-Service Welding Ibaa, Rivers SPDC Feb 2025
13IC Repair by Clamping, 6" Line @ Okutukutu Pipeline Clamping Okutukutu, Bayelsa SPDC Jan 2025
14Multi-location EGBA→Plidco, 24" Ogale–Bodo TNP EGBA Clamp Nonwa · Kpite · Bera, Rivers RAEC Nov 2025
15Mechanical POI Investigation, 24" TNP @ Egbalor Positive Isolation Egbalor, Rivers RAEC Nov 2025
16EGBA Clamp Changeout, 20" Rumuekpe–Nkpoku TNP @ Ibaa EGBA Clamp Ibaa, Rivers RAEC Dec 2025
17Post-IP Defect Repair by Sectional Replacement @ Agbonchia Sectional Replacement Eleme, Rivers RAEC Dec 2025
18EGBA Clamp Replacement, 36" Rumuekpe–Nkpoku @ Rumuji EGBA Clamp Rumuji, Rivers RAEC Sep 2025
19Post-IP Defect Dig Verification, 28" TNP (3 locations) Defect Verification Bodo · Nokpor · Eteo, Rivers RAEC Aug 2025
20JIV / In-Service Welding (Split Tee), 36" Rumuekpe–Nkpoku In-Service Welding Ibaa, Rivers SPDC 2025
21 Sectional Replacement of 4" W15T Flowline (11.6m) — Diebu Creek NEW · FLOWLINE Flowline Replacement Otokolomabia, Diebu Creek, Bayelsa RAEC Jun 2026

Showing 21 of 46 documented projects. The complete ISO 9001-aligned register with scope descriptions, dates and COR references is available for pre-qualification: projects@martoglobal.com

KP 04 / HSSE

Safety is how leaders are measured.

0.00LTI RATE — ALL OPERATIONS

Every intervention is planned through Job Hazard Analysis, executed under permit-to-work control and supervised by competent HSE personnel. 150,000+ safe man-hours across live pipeline operations — and every single Close-Out Report incident-free.

PLAN

JHA & risk assessment on every scope. Site-specific HSE plans. Emergency response mapping.

CONTROL

Permit-to-work discipline. Gas testing on live lines. Positive isolation verification.

PEOPLE

Daily toolbox talks. Competency-verified welders. Trained fire watches.

PROVE

Incident-free CORs. Client HSSE audits. Continuous improvement reviews.

KP 05 / TRUSTED BY

Nigeria's leading operator networks.

SHELL SPDC logoRENAISSANCE logoEXXONMOBIL logoCHEVRON logoNNPC LTD logoOANDO logoOILSERV logoWAGPC logoNORTON ENG. logoGRAMEN logoSHELL SPDC logoRENAISSANCE logoEXXONMOBIL logoCHEVRON logoNNPC LTD logoOANDO logoOILSERV logoWAGPC logoNORTON ENG. logoGRAMEN logo
KP 06 / PEOPLE

Leadership that stays on site.

Behind the leadership: certified argon & arc welders, pipe and mechanical fitters, civil engineers, riggers, machinists and QHSE professionals — able to execute in any Niger Delta terrain.

PA
Dr. Paul AkindasaMANAGING DIRECTOR / CEO

PhD Operations & Production Management. Geoscientist. The standard-setter.

ST
Shofoluwe TemitopeLEAD, OPERATIONS

Drives every mobilization from award to close-out report.

ES
Enujowo SeyifunmiLOGISTICS MANAGER

Marine spreads, materials and movement across three states.

UD
Uchechukwu DanielLEAD, HSSE & ADMIN

Guardian of the 0.00 — permits, JHAs and the safety culture.

KP 07 / START A PROJECT

Your next campaign, delivered without excuses.